Primary Bath And Walk-In Shower Remodel In Corona de Tucson, AZ

A Walk-In Shower With No Step And Frameless Glass

A Bathroom They Could Use Day To Day

The primary bathroom in this home was not being used. Jerry and Sherri wanted it functional again, a bathroom they could have back and use day to day. They found Frei Remodel and Design online, and the work started with a phone call.

Project Cost

Expected: $40,000

Actual: $41,450

Costs shown reflect pricing when this project was completed. The same work may cost more today.

Timeline

Expected: 4 weeks

Actual: 4 weeks

Location

Corona de Tucson, AZ

"We wanted to get it done before the holidays and then just be able to start enjoying our bathroom again. I stumbled onto Frei's website."

A Reworked Shower And A Painted Vanity

Shower stall with brown tile walls, light beige floor tiles, a central square drain, and a glass door on the right.

A Level Floor With No Step Over

We got rid of the old curb, so the bathroom floor runs level into the shower with no step down or step over. Tile now goes all the way to the ceiling instead of stopping partway up the wall.

Joe from Frei shows the half pony wall built against the vanity, with the frameless glass panel set on top.

Frameless Glass And A Half Pony Wall

A half pony wall is now built against the vanity, closing the narrow gap that used to be between the vanity and the shower. The frameless glass door is set on that wall and swings both ways to get in and out.

Joe from Frei points out the tiled shower bench, with the 2-level niche and its shelf above.

A Shower Bench And A 2-Level Niche

The niche is built into the tiled wall, with a shelf that splits it into 2 levels. A new bench is in the lower corner, so there is a place to sit down in the shower.

The double vanity with painted cabinets and 2 black-framed mirrors.

Painted Vanity With A New Countertop

We painted the existing vanity instead of replacing it, which kept the carved arch panels on the doors. A new countertop went on top, and the black-framed mirrors over the 2 sinks are new.

What Was Wrong With The Old Bathroom

From First Call To Finished Bathroom

A Paid Design First

Design: a 3D rendering of the new vanity wall with the half pony wall and glass shower beyond.

Jerry and Sherri called, and about a week later they moved ahead with a paid design. It came with a floor plan plus 2D and 3D renderings of the new shower and vanity wall to look over.

Joe from Frei Remodel and Design showing the handheld shower in the finished walk-in shower.

Rebuilding The Shower

With the design settled, we took out the existing shower and reconfigured it in the new layout. The same job also brought new lighting and a new floor to the rest of the room.

The primary bathroom with a double vanity, a half pony wall, wall sconces and a frameless glass shower.

The Finished Bathroom

The black-framed mirrors over the 2 sinks, the painted vanity, and its new countertop were all part of the same job. So the whole primary bathroom was finished together.

The Finished Primary Bathroom

Hover over pulsing button to learn about the individual features

[frei_hotspots number="1"]
[frei_hotspots number="2"]

What Jerry Said On Video

“The space is absolutely beautiful. It’s so functional. Even just going into the room now and just looking at it and admiring it, it wasn’t just the new look, it was the quality behind that look.”

—Jerry, Corona de Tucson, AZ
Joe from Frei Remodel and Design with the homeowner in the finished primary bathroom.

Final Notes About The Project

The bathroom was done in 4 weeks, on schedule. Upgrades Jerry and Sherri requested are part of why the final cost of $41,450 came in above the original $40,000.