Key Points

A successful kitchen remodel starts with getting clear on your goals, designing around how you actually use the space, investing in quality cabinetry, and planning lighting in layers.
The materials you choose should withstand the Arizona climate, with quartz and granite countertops and high-quality cabinet construction protecting your investment for years.
The right contractor brings a personalized design process, local expertise, and verified credentials that turn a stressful renovation into a smooth one.

Key Points

  • A full kitchen remodel can include a new layout that fixes what gets in your way. That could be an island too close to the cabinets or a corner too dark to use.
  • Our kitchen prices start around $60,000 to $80,000 for a basic remodel. A kitchen plus a bathroom starts around $100,000 (May and June 2026 figures).
  • One of our kitchens was given a 4- to 6-week timeline and finished in 4 weeks to the date.

Maybe your kitchen has a spot you work around every day, and you’re ready to redo the whole room. Before you start, you want to know what a full remodel includes, what it costs, and how long you’ll be without your kitchen.

You’ll learn:

  • Why a full kitchen remodel starts with the layout
  • What goes into planning the new layout, from the cabinets to aging in place
  • Where our kitchen remodel prices start
  • How long the build takes

Why Does a Full Kitchen Remodel Start With the Layout?

A full kitchen remodel starts with the layout when the layout is what’s behind the things you work around every day. That could be an island too close to the cabinets or a corner too dark to use.

Tom and Dana’s kitchen is one example. They didn’t like the layout, and they needed more storage space. Their island was turned at an angle, really close to theexisting cabinets. The fridgewas in the wrong spot, and one corner was a dead spot that needed more light.

Remodeled white kitchen with a reworked island and relocated fridge beside a spiral staircase

So we scrapped the existing footprint (the way the room was laid out) and started over. We reconfigured the island, moved the fridge, and knocked a hole in the wall of that dark corner to install a window. In our tour video of their home, the new kitchen is described as “so much more open,” with “much more light.”


What Goes Into Planning the New Layout?

Planning the layout means deciding where everything goes and what goes inside the cabinets. That way, the kitchen works for how you cook now and as you get older. We look at:

  • Where the stove, cooktop, and fridge go
  • Which pull-outs (shelves or bins that slide out) and other features go inside the cabinets, based on how you cook
  • The island, because a kitchen can be too small for one, and removing it may make the room work better

For a kitchen, aging-in-place (staying in your home as you get older) mostly means making the room morefunctional and spacious. That lets you keep working in it as you age.

Open knotty alder kitchen drawers with dividers under cabinet lighting

Inside the cabinets, the features can be as simple as banks of drawers in place of lower cabinet doors.

If you need a walker or more space to move, we can plan your kitchen for that.


What Does a Kitchen Remodel Cost With Us?

A full kitchen remodel can cover new cabinets, countertops, a sink and faucet, backsplash, lighting, paint, and flooring. A basic one with us starts at about $60,000 to $80,000 and goes up from there.A kitchen and a bathroom remodeled together start at about $100,000.

These figures are from May and June 2026, and the same work may cost more today.On our first video call with you, the virtual discovery call, we give you an ideaof what your own kitchen could cost.


How Long Does the Build Take?

On Michelle’s kitchen, we gave her a 4- to 6-week timeline, and we completed it in 4 weeks to the date. That was one kitchen, so yours may run differently.


Ready to Plan Your Full Kitchen Remodel With Frei Remodel and Design?

The first step is a short video. You fill out your information on our website and shoot a short videoof your kitchen. You tell us what’s going onand what you want done. Then we set up a virtual discovery call to talk through your project. If you’re good with everything after that call, the next step is a paidremodeling designphase.

We dokitchen remodelingin Oro Valley and Catalina Foothills. Fill out our contact form or give us a call.


FAQs

Does moving the plumbing add a lot to a kitchen remodel?

Changing a kitchen’s plumbing is a small part of the cost.In December 2025, we put that cost at about $2,500, and it may be higher today.Re-piping the whole house is a separate conversation, priced on its own.

How long is the virtual discovery call?

Plan on about 15 to 20 minutes. We talk about your project, what you like and don’t like about your current space, and some pricing. You can take the call from home, since it’s a video call.

What should I get in writing before my kitchen remodel starts?

You should get a detailed contract, like the ones we write. It should cover the permits, the licensed trade partners who will do the work, and a set of plans and the design.

What happens when my kitchen is finished?

We do a full cleaning of the kitchen and any roomsnext to it. Then we do a final walkthroughwith you to make sure everything’s up to par. After that, we come out for a warranty walkthrough every 6 months for the first 2 years.

Frequently Asked Questions

How long does a kitchen remodel take?

A kitchen remodel typically takes three to four months from your first design meeting to the final walkthrough, with about six to nine weeks of that spent on active construction. Cosmetic refreshes can finish in a few weeks, while full gut remodels with structural changes can run longer. Locking in every selection before construction starts is the best way to keep your project on schedule.

Do you need a permit to remodel a kitchen in Arizona?

Yes, most kitchen remodels in Arizona require a permit if they involve plumbing, electrical, mechanical, or structural work. Purely cosmetic updates like paint or new flooring usually do not. Only a contractor licensed through the Arizona Registrar of Contractors can pull those permits, so working with a licensed general contractor is the safest route.

How do I live without a kitchen during a remodel?

Set up a temporary kitchen in a low-traffic spot like your dining room or garage with a microwave, slow cooker, air fryer, coffee maker, and a mini fridge. Plan simple one-pot meals, salads, and pre-cooked freezer portions to cut down on cleanup, and use your outdoor grill when the weather cooperates. Budget for extra takeout and washing dishes in a utility or bathroom sink until your new kitchen is ready.

Read More From Frei Remodel and Design